Tyne Tunnel

Bouygues  Travaux UK Branch

Tyne Tunnel

 

This project was to update and refurbish both the North and South entrances of the original Tyne Tunnel.

Both entrances were rendered using a high polymer base coat render. This was the allowed to dry, before being painted with a primer.  The final coat of TC15 – a synthetic render was then applied. This is a hard wearing a highly flexible render.